Service Interruption Notice

Crane Operation, Saturday, April 19, 2025 from 7:00am-5:00pm, QNC

Where is this happening?

QNC

What is happening?

Crane lift/Strobic fan replacement

When is this happening?

Saturday April 19th, 2025 from 7:00am- 5:00pm Rain date April 20th. (Easter Weekend)

How does this affect the UW community?

Ring Road will be limited to one lane of vehicle travel and use of only one sidewalk (on the far side) in that area. The QNC loading dock will not be accessible due to crane work and labs will not be operational. There will be no use of fume hoods, or exhausts in these areas. Offices and general lobby areas are still accessible as well as access into and out of the building with the exception of the loading dock.

Who to contact for more information?

Jason Brown
j46brown@uwaterloo.ca
519-888-4567 ext. 40582

This work must be performed at this time, and cannot be rescheduled.